Daytime Noise Monitoring Results                    
                           
Station M7, Wah Ming House                      
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
03-May-10 13:00 13:30 Sunny 61 62 60 Operation of Mobile crane
and pipe piling work
Celling water-proof construction at
Wah Mei House and removal asbestos
 at Wah Hong House
N.A 24.2 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
12-May-10 13:09 13:39 Sunny 61 63 59 Pipe piling work Celling water-proof construction at
Wah Mei House and removal asbestos
 at Wah Hong House
N.A 24 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
18-May-10 09:15 09:45 Sunny 65 67 62 Pipe piling work Repaving floor
construction at
Wah Ching House 
N.A 27.3 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
28-May-10 09:40 10:10 Sunny 63 65 61 Pipe piling work Repaving floor
construction at
Wah Cheung House 
N.A 26.9 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
      Min. 61                  